Friday 26th of May 2017

Description

Six years of construction

113.000 Square Meters of construction in buildings

50.000 Square Meters approximately in parking areas and outdoor spaces

It has 10 buildings:

A Mega Auditorium (12.200 people sitting in theater-style seats)

An Integrated Services building.  A building for Administrative Services (4 floors for offices, TV Sets and recording studios).

Educational Buildings. Three buildings destined for the functioning of Christian Fraternity Bilingual School which include an area for Administrative Offices, Pre-School, Grade School, Jr. High and High School.  And also for the Champions Champion´s Zone (Sunday School) for Children Care  on weekends (62 classrooms, 3,000 children and two Magna Auditoriums)

A Convention Center (Bookstore, cafeteria and rooms for multiple uses)

A parking tower (7 floors with capacity for 1531 vehicles)

It also has:

Two main entrances:

  • A private ramp access on the main boulevard in Ciudad San Cristobal.
  • Another entrance for those coming from the Calzada Roosevelt to the south, it is located in the street between Burger King and CEMACO.

A internal Ring Road (0.75 miles approx.)

A private exit ramp to San Cristobal main boulevard.

An indoor unroofed area for another 1,000 vehicles.

Two gardened plazas.

Acoustic diffusers designed specifically for the Mega Auditorium

Latest Technology in Line Array type loudspeakers, digital consoles and wireless microphones.

Six multimedia screens in the Mega-auditorium and 34 plasmas distributed on the platform and hallways of the Mega Auditorium.

And much more …